Avalanche Control
Conditions reportDuffey Lake Road
Jeff Van Driel · Mar 5, 2017 · Duffey
Conditions report
- Location
- Duffey Lake Road
The BC Ministry of Transportation and Infrastructure will be conducting helicopter avalanche control with explosives on Rohr Ridge and Blowdown Peak on Monday, March 6, 2017 between 09:00 and 11:00. Sections of the highway will be closed at regular intervals for up to 30 minutes at a time for the duration of the control period.
Please no recreational activities on Rohr Ridge or Blowdown Peak during this time. Thank you very much.
Coast/Chilcotin Avalanche Program